Pig Buildings
This is a project which we did in October 2010 and then added to in May 2011. We did the first two buildings in October and then added three this May. The buildings are all 30’ (9.1m) wide by 60’ (18.2m) long with two ends. The back end has galebreaker windows for ventilation and the front has an opening with steel work installed by the firm for which we put up the buildings. All the buildings are on 4’ high walls made with 9” breeze blocks infilled with concrete and re-bar.



